BUS STOP PROTOTYPE #9: Delivery and Site Installation

Side by side. (Existing bus stop on the left, prototype on the right) 
Actual Location of this Prototype

The entire project from start to delivery only took 2 weeks!

The bus stop prototype was delivered and installed on site (one day before Movement Control Order started)

The side awnings were designed to fold downwards for ease of transportation.

Side awnings installation




BUS STOP PROTOTYPE #10: COMPLETE!